View non-flash version
Ports to call for York 24-hour service. Factory-trained air condition- ing and refrigeration experts for 24-hour marine service. A full stock of York parts for anything you have on board. A complete range of York units to order without weeks of waiting. You can expect it all around the free world from York — from these York marine experts. 1. ADRICK COOLING CORP. 30 B. Remington Blvd., Ronkonkoma, NY 11779 . .(516) 585-4231 Branch: Adrick Marine Corp. 77 River St., Hoboken, NJ 07030 (201) 420-1339 2. BAILEY REFRIGERATION CO.. INC. 74 Sullivan St., Brooklyn, NY 11231 (212) 855-3958 Branches: 2323 Randolph Ave. Avenel, NJ 07001 (201) 382-1225 524 N.E. 190th St. North Miami, FL 33179 . . .(305) 651-4160 3. BAILEY CORPORATION 632 Alvar St., New Orleans, LA 70117 (504) 943-2461 4. GENERAL MARINE REFRIGERATION 1100 N. Front St., Philadelphia, PA 19123 (215) 922-6293 Branches: Chesapeake Marine Refrigeration Corp. 2626 Cromwell Rd., Norfolk, VA 23509 (804) 853-6856 Key Marine Refrigeration, Inc. 1625 Fleet St., Baltimore, MD 21231 (301) 563-2880 5. JW MECHANICAL SERVICE CO. 6540 Federal Blvd., Lemon Grove, CA 92045 (714) 582-6320 6. PSER, INC. 3441 17th Ave., West, Seattle, WA 98119 (206) 283-3200 Branch: 6000 N. Lagoon Ave. Portland, Oregon 97222 P.O. Box 22153 (503) 234-2904 7. QUALITY REFRIGERATION 533 North Fries Ave., Wilmington, CA 90744 . . .(213) 549-1532 Los Angeles, CA (213) 775-2735 8. TOMLINSON REFRIGERATION AND SUPPLY CO. 324 Broadway, Elizabeth, NJ 07206 (201) 351-1350 For any kind of marine air con- ditioning or refrigeration service, call the experts in every port. York Division of Borg-Warner Corp., P.O. Box 1592, York, PA 17405 fit 1NL B0RG^wARN"^ Write 375 on Reader Service Card September 15, 1981 Vancouver Shipyards Launches Log Barge On A Film Of Water The building capabilities of some ship- yards are hampered by the problems in- volved in moving a launch-ready hull across dry land to the ways. For Vancouver Shipyards Co., Ltd., North Vancouver, British Columbia, the solution has been to use "water bearings" to float the hull across land on a .005-inch film of water. In so doing, the yard has expanded its capability from a vessel size of 270 feet and 1,200 tons to a present maximum of 500 feet and 9,000 tons. In addition, the water bearings allow the company to build several larger ships simul- taneously. "With the water bearing system that we now use for this purpose, we can have several ships at various stages of con- struction," according to Ken Davies, naval architect for the firm. The company's first major use of water bearings to position a large ship for launch took place in 1975, with the transfer of a 457-foot-long, 3,500-ton ferry for the pro- vincial government. The most recent use of the system took place when the yard launched the first barge to be designed spe- cifically to carry bundled logs. That barge, the Seaspan Rigger, will cost $11 million when completed. The barge has an overall length of 120 meters (about 394 feet), molded breadth of 27 meters (89 feet), and cargo deadweight of 12,700 tons. The barge is intended to serve major forest companies around the Queen Charlotte Islands, off the west coast of Canada, and Vancouver Island. As with the ferry and other vessels sim- ilarly launched, the barge was moved from its building berth across to the launch sleds for side launching, using water bearings or "casters" supplied by Aero-Go, Inc., of Se- attle, Wash. The launch weight of the Sea- span Rigger was 3,000 tons. Water bearings are basically the same design as the air bearings developed over 15 years ago by Aero-Go. The major dif- ference between the two systems is that the water bearings employ a thin (.005-inch) film of water instead of air on which the load moves, almost free of friction. In the launching of the Seaspan Rigger barge, the cradle of the barge moved on 96 Aero-Caster water bearings in carrying the ready-to- launch vessel 150 feet to the launch sleds. Each inflatable 48-inch by 48-inch caster has a circular element, or torus bag, per- manently bonded to a rigid backing plate. The bag is donut shaped, forming a central plenum chamber inside. There are also cor- ner and center "landing pads" to support the load when the element is not inflated. For lifting and moving, water is pumped into the bearing at a pressure of 50 psi. As soon as pressure within the caster exceeds the load's weight above it, the water escapes very gradually under the flexible bottom face, raising the load about .005 inch over the surface, which in this case is one of a number of concrete runways. The result is that the load floats above the surface so that approximately 1,000 pounds of load can be moved with only one pound of force. Because the load can be moved with equal ease in any direction, work can be scheduled with great flexibility, Mr. Davies points out. "We can build ship modules under cover, move them past one another on the building berth if required, and adjust to unforeseen Connections and hoses under barge lead to Aero- Caster water bearings placed directly on concrete run- ways. When water bearings are inflated, they create a film of water to float barge along runways during transfer. The 96 Aero-Casters used to move the barge were made by Aero-Go, Inc., Seattle, Wash. schedule changes under circumstances such as delays caused by special supply problems." In the handling of the 3,000-ton log barge, the cradles on which the hull rested were sets of blocks, each 50-feet long. These in turn rested on wood spacers holding the blocks 2 inches above the concrete runways. This provided space for the insertion of the Aero-Caster bearings approximately one week before moving time to allow hookup of the water system. It took only two hours to place the water bearings and a week to install pipe manifolds and hoses. The yard used 3-inch-diameter pipe for the manifolds and 100-foot-long hoses from the service pits to the manifolds, with smaller hoses between the manifolds and the casters. A crew inflated the water bearings, which lifted the blocks approximately 4 inches above the concrete runners. Motive power and guidance were provided by six crawler cats, two pushing and two braking, with one at each end to control movement fore and aft. "The vessel was also kept on line by a series of guide rollers attached to the launch cribs and acting on the sides of the concrete runways and launch sleds. We also had a 10-man crew on the ground including supervisors standing by." The excess water from the bearings was no problem, Mr. Davies adds, since it also kept the runways clean and simply drained off into the ground. .j^v&Srar l? • •V "V Typical water bearing installation under the barge shoring. 41