34 Maritime Reporter & Engineering News
OSG Signs Time Charter
Overseas Shipholding Group, Inc.
signed an agreement with Parakou
Shipping Ltd., an international shipping
company based in Hong Kong, to time
charter four product carriers for 10 years
each. The vessels, two of which are
already under construction, will be built
by STX Shipbuilding Co., Ltd. in Korea
and are scheduled for delivery to OSG in
September and October 2006 and April
and June 2007. The product carriers, all
sister ships with a capacity of 51,000
dwt and six segregations, will be able to
transport petroleum products, vegetable
oils and IMO III chemicals. Delivery of
the vessels will increase the number of
product carriers in OSG's fleet to 50.
Wärtsilä Power for Keppel
FELS Rigs
The semi-submersible drilling plat-
forms for Keppel FELS will be
equipped with generating sets and steer-
able thrusters from Wärtsilä. Wärtsilä
Corporation has been awarded contracts
with a total value of more than $60 mil-
lion, by Keppel FELS Ltd. in Singapore
for 32 diesel generating sets to power
four jack-up rigs and two semi-sub-
mersible drilling platforms. The com-
bined output of these orders is about 115
MW. Wärtsilä will also supply steerable
thrusters for the semi-submersible plat-
forms. The rigs and platforms are being
built at Keppel FELS Ltd for the Danish
company A.P. Møller - Mærsk A/S. The
first of the jack-up rigs is due for deliv-
ery in the fourth quarter 2007, and the
semi-submersible platforms are due to
be delivered in 2008 and 2009.
The four jack-up rigs are of the CJ50
design from Marine Structure
Consultants. They can operate in water
depths of up to 106.7 m, and drill high-
pressure wells down to 9,144 m. The
main power supply on each rig will be
provided by four eight-cylinder Wärtsilä
26 generating sets with a combined elec-
trical output of 9,600 kWe.
Each semi-submersible will have a
dynamic positioning system with eight
electrically-driven Wärtsilä Lips steer-
able thrusters. The platforms will also be
able to be attached to a pre-laid mooring
system. The semi-submersible platforms
will each be equipped with eight 16-
cylinder Wärtsilä 26 generating sets
having a combined electrical output of
38,720 kWe.
Circle 11 on Reader Service Card
Teekay Implements
Bunker Procurement
Software
Teekay Shipping Corporation has inm-
plemented Bunker Logistics'
BunkerDashboard Bunker Procurement
Software, which is designed to help
users and distributed teams improved
their knowledge base, collaborative
efforts, productivity and performance.
Mark Cameron, Director of
Procurement for Teekay Shipping, said
"We wanted to streamline and improve
our bunker procurement processes while
increasing the integrity and value of the
data we were capturing. With LQM's
Bunker Dashboard, we have found a
solution that helps us improve our
processes and allows us access to the
most current market data to support
management decisions and assist analy-
sis."
Circle 12 on Reader Service Card
3 H I P O W N E R S
# H A R T E R E R S
3 H I P P E R S
" A N K S
0 ) # L U B S
( U L L 5 N D E R W R I T E R S
4 R A D I N G # O M P A N I E S
' O V E R N M E N T S
4 ( % 0 / 7 % 2 / &