jorge G. Sharp, Inc.
>points Gluse As Director,
;et Support Operations
Michael R. Gluse
George G. Sharp, Inc. of New York
mounced the appointment of
iichael R. Gluse as director, fleet
ipport operations, located in
larp's Norfolk, Va. office. In this
jsition, Mr. Gluse will provide fo-
is and direction to those Sharp
infracts which provide direct fleet
ipport in areas such as planning,
lalysis, training, logistics, modern-
ation, repair and maintenance. He
an active member of the Tidewa-
:r Chapter of the American Society
F Naval Engineers, the Society of
[aval Architects and Marine Engi-
eers, the Portsmouth Rotary Club
nd has served on several civic ser-
ice programs.
Norwegian Shelf Oil
(nd Gas Expectations
tise 12 Percent
According to new estimates from
he Norwegian Petroleum Director-
,te, resources on the Norwegian
!helf have increased 12 percent and
Norway will remain one of the larg-
ist oil producers in the world for at
east another 45 years.
New calculations show that the
Norwegian sector of the Continen-
,al Shelf contains extractable re-
iources corresponding to about 10
rillion tons of oil equivalents (toe).
In 1992, the total petroleum pro-
luction of the Norwegian Shelf was
ibout 132.9 million toe. Of this, the
)il production was approximately
103.9 million toe, the sale of gas 25.8
nillion toe, and the production of
LNG three million toe.
These numbers signify a large
production increase over the previ-
ous year, when total production was
118.8 million toe.
Additional Repair Work
Coming To H-DIL
As work on the vessel Marinor
has been completed at Halifax-
Dartmouth Industries Limited's (H-
DIL) Halifax Shipyard, the company
is now looking forward to doing re-
pair work on two more vessels.
June, 1993
The Marinor was docked for re-
pairs to its rudder which was dam-
aged by ice.
The Marine Atlantic ferry M.V.
Caribou arrived at the Halifax Ship-
yard and was docked for rudder re-
pairs.
Last month, the Imperial Oil
tanker, Imperial Acadia, was docked
for a refit.
Earlier, the Canadian Coast
Guard vessel, John Cabot, was
docked for a 30-day refitting and
repair work.
For more information on H-DIL,
Circle 42 on Reader Service Card
MSC Charters The Largest
U.S.-Flag Tanker
The U.S. Navy's Military Sealift
Command chartered the U.S.T. Pa-
cific, the largest tanker in the U.S.-
flag merchant fleet, to carry 2.5 mil-
lion barrels of oil from the U.K. and
Norway to the U.S. Gulf Coast.
The operation took more than four
weeks and $7.3 million to complete.
. The Pacific is almost 1,188 feet
long, the largest ship in the Navy's
fleet. It has a 228-foot beam and a
75 foot draft. MSC operates these
ships in three separate forces: the
Naval Fleet Auxiliary Force; the
Special Mission Support Force; and
the Strategic Sealift Force.
Traditional
Design
The Emerald Lady...
Designed by John W. Gilbert & Associates and
patterned after the most successful sternwheelers of
the late 1800's, the "Hudson" and the "Queen City,"
"The Emerald Lady," twin sister of the "The Diamond
Lady," offers the grandeur of the original 19th Cen-
tury Steamboats with rich Victorian interiors on four
decks of casinos, gift shops, passenger lounge, main
dining room and upper dining areas and children's
arcade. Larger sister vessel "Par-A-Dice" operates
from Peoria, Illinois.
For over 25 years, John W. Gilbert & Associates
has been known for excellence and innovation in
design of all types of riverboats and coastal vessels.
JOHN W. GILBERT &
ASSOCIATES, INC.
Naval Architects & Marine Engineers
for over 25 years
66 Long Wharf, Boston, MA 02110
(617) 523-8370 (617) 523-2178 fax
Stainless Steel
From
Bow
To Stern
• All Stainless Steel
Marine Cooking Equipment
• Free U.S. Delivery
• Completely Hatchable
• Built To Last
• Custom Modifications
Available
Ranges, Fryers, Griddles, Broilers, Cheesemelters, Clamshells,
Convection Ovens, Pizza Ovens, Deck Ovens, Custom Design
Lang Manufacturing Company
P.O. Box 905, Redmond, WA 90873
Phone (206)885-4045 U.S.A.
Fax (206)882-2373 U.S.A.
Circle 262 on Reader Service Card
Are You In Compliance ?
OPA '90
SPILL KIT
MEETS OPA '90 REQUIREMENTS
EACH KIT ABSORBS 7 BARRELS
CLEARLY LABELED WITH CONTENTS
& ABSORBENCY
SIZED TO FIT 36" DOORWAYS
CUSTOMIZED KITS ALSO AVAILABLE
Circle 185 on Reader Service Card
Circle 318 on Reader Service Card 83
Digital Wave Publishing