Renk Tacke To Supply
New Gear Units For
Finnjet Superferry
Renk Tacke GmbH received an
order for the delivery of a new gear
unit system for the Finnjet by the
Finnish shipping company group
Effjohn Oy AB.
The CODELAG gear unit system
(Combined Diesel-Electric and gas
turbine) can be run diesel electri-
cally, only with gas turbine in com-
bined operation according to the
vessel's speed. To minimize fuel
consumption, the most favorable
propeller speed is achieved using
three different gear unit ratios.
The Finnjett is a gas turbine pro-
pelled vessel which runs between
Travemunde and Helsinki year-
round and has a maximum speed of
30 knots.
The gear units will be delivered
in April 1994 after a design period of
only 13 months. The exchange of
the gear unit system must be com-
pleted within a basic overhaul of 14
days.
Bollinger Names Executive
Appointments
Bollinger Machine Shop & Ship-
yard, Inc., long recognized as a ma-
Some are calling it the greatest advance in navigation safety since radar.
ECPINS
The IMO compliant ECPINS (Electronic Chart/Precise
Integrated Navigation System) gives the navigator "own-
ship" position twice a second, warns him of dangerous waters
ahead and shows continuous information on all fixed and
moving radar targets. With ECPINS, he can make the right
decisions in stressful situations and navigate safely, particularly
in confined waters, in extreme weather and under fog and ice
conditions.
ECPINS intelligently combines information from a
variety of navigational sensors (GPS/DGPS, gyro, log, depth
sounder, etc.) and displays "own-ship" position with great clarity
on an authorized electronic vector chart. Navigational radar data
plus ARPA data from existing bridge radar can be superimposed
on the electronic chart display.
CHART DESCRIPTION
CHART DESIGNATOR
RANGE FROM OWN
SHIP POSITION TO
RELATIVE MOTION
DISTANCE
BETWEEN RANGE
RINGS
ANTI-GROUNDING
SECTOR
SPOT SOUNDINGS
PRESENT OWN SHIP
POSITION
PAST TRACK OF
VESSEL(EACH DOT
REPRESENTS A
POSITION, PLOTTED
ONCE EVERY
SECOND
ELECTRONIC CHART / PRECISE INTEGRATED NAVIGATION SYSTEM
ECPINS projects an Anti-Grounding Sector ahead of the
ship. When the operator inputs a safe depth, both visual and
audible alarms will sound in case of shallow waters, or if "above
water" chart features, such as rocks, land, piers, etc. are within
the sector.
Chart data can be viewed on multiple non-overlapping windows
at different range scales and presentation modes. All vital
navigation data are summarized in a NAV display window. The
system is easily operated via trackball cursor and built-in keypad.
A 24-hour log is kept showing all vital sensor data.
ECPINS complies with all IMO performance standards for ECDIS. The
result of over 10 years of research, ECPINS is used by shipping
companies, ferries, and the U.S. & Canadian Coast Guard and Navy.
| off/bore /y/tem/ international inc.
19015 36th Ave. West, Suite BC
Lynnwood, WA 98036 USA
(206) 670-8400 Fax: (206) 670-0660
jor southern repair facility for li
haul towboats as well as area a
gulf shore vessels, has nam
Tillman Esteve as vice presid*
and general manager of Bollin;
Quick Repair, Inc.
Established in 1947, Avondi
Harvey Quick Repair was bought
Bollinger Machine Shop & Shipya:
Inc. in March of this year.
The company also announced tt
Mark Detillier has been nam
the new vice president and genei
manager of the Larose Division, ai
Paul Bailleaux has been nam
yard superintendent of that facilit
Finally, Stephen Walker h;
been named program manager
the Fiberglass Division.
The current fiberglass progra
is focused on a contract to build ]
33-foot rigid hull inflatable boats f<
the U.S. Navy.
For more information on the ci
pabilities of Bollinger Machine She
& Shipyard,
Circle 66 on Reader Service Card
HDW Acquires
55,000-Ton Floating Dock
Howaldtswerke Deutsche Werf
A.G. (HDW) of Kiel announced tha
it has acquired a 55,000-ton floating
dock from Cityvarvet, Gothenburg
The floating dock will be ready foi
service at HDWs Kiel Shipyard earl}
next month.
The acquisition of the drydock
was prompted by HDWs decision to
improve and modernize its capacity
for repairs and conversions of all
types and sizes of ships.
HDWs new dock is 991 feet long
and 180 feet wide.
HDWs four graving docks include
one dock of 1,398 x 289 x 28 feet
which, while mainly used for
newbuilding, is also available at
times for major repairs and large
conversions.
For more information on HDW,
Circle 69 on Reader Service Card
Kvaerner Receives U.K.
Naval Order Worth
$12 Million
Kvaerner A/S, a Norwegian engi-
neering, shipping and offshore
group, recently announced that its
Kvaerner Govan unit of the U.K.
will receive $12 million to build a
helicopter carrier for the British
Royal Navy in a joint project with
Vickers Shipbuilding Engineering
Ltd. (VSE).
The new vessel will measure 656
feet, weigh 20,000 gt and will be
classed as a landing platform heli-
copter carrier.
Kvaerner Govan will build the
vessel to normal specifications, while
VSE will supply and install all mili-
tary equipment.
110 Circle 194 on Reader Service Card Maritime Reporter/Engineering News
Digital Wave Publishing