Maintenance can be simplified with projection systems
that automatically calibrate for intensity matching and
centralized projection system control can ease operating
use.
Give your new system a
powerful brain
You can optimize the overall effectiveness of your
daily operations by integrating the right alignment and
management tools into your visual display system.
Today's market offers powerful tools for multi-system
control and automated alignment. These technologies
work hand-in-hand to streamline the setup, control, and
alignment process, allowing simulation centers to per-
form daily operation tasks faster, better, and more cost
effectively. Investigate these solutions to realize big sav-
ings at your facility.
If you use CRT projectors in your visual display sys-
tem, it's inevitable that you'll have to replace them.
Replacing your CRTs should not be underestimated, nor
should it be entrusted to just any provider. There are
many organizations selling non-factory authorized
replacement CRTs. Replacing your CRTs with cheap
components can cause serious problems with your dis-
play system and may void your projection system war-
ranty and/or maintenance contract. Do you want to take
this risk? Make sure you buy the proper CRT from an
authorized source and that it meets your unique system
requirements.
The preceding was submitted by Phil Laney, Market
Development Manager, Barco Simulation.
August, 2005 • MarineNews 33
Circle 228 on Reader Service Card
Circle 207 on Reader Service Card
Circle 241 on Reader Service Card
Learn At The Helm Course Offerings
www.chapman.org
1-800-225-2841
Professional Development Courses
• USCG license Training through 200 GT
• STCW 95, Basic & Advanced Firefighting, GMDSS, BRM, SSO, AB
• Professional Mariner Training
• Marine Surveying
Recreational Courses
• Chapman Powerboat Certification
• ASA Sailing Certification including Celestial Navigation
• Private Instruction – your boat or ours
WATERMAKERS-AC/DC-Compact Units-400-4000 GPD
WATERMAKERS-AC/DC-Compact Units-400-4000 GPD
Oily Water Separators
Sizes from 2-45 GPM No filters to change
Meets IMO MEPC 60 (33) regs
Powder coated, SS piping, bronze valves
Starting under $3500 Yes!
Got Oily Water? Call now!
$ $ $ Economy Marine Systems $ $ $
Coast Guard / IMO Approved & Certified
Well-built, simple, basic reliable designs
Skimoil, Inc. 314-579-9755
info@skimoil.com www.skimoil.com
EZ to retrofit -- 4 & 12-man units -- Corrosion-proof
Complete systems under $2500 Yes, it's true!
These systems EATScrap -- No BS -- The real deal!
Replace that nasty old rusty MSD. Call now!
Marine Sanitation Devices
Type II MSD's -- Small footprint
TRAINING & EDUCATION
Case Study:
Upgrade at South Tyneside
Maritime Training College
South Tyneside College is among the world's pre-
mier institutions for marine and offshore training, and
is designated the UK's National Nautical Center of
Excellence. Many students and international compa-
nies use its simulation center for maritime-related
training.
This facility used an older non-Barco projection
system that produced poor color balance and varying
brightness across all channels. Concerned with the
display quality, South Tyneside consulted Kongsberg,
which recommended Barco. Following a demonstra-
tion and technology presentation at the Barco factory
in Kuurne, Belgium, South Tyneside chose to upgrade
its system with an 8-channel, BarcoReality SIM 4 sin-
gle-chip DLP projection solution. Equipped with
Constant Light Output (CLO) and Linked DynaColor
options, the Barco solution provided the high con-
trast, color uniformity, and brightness uniformity
needed to meet the training center's visualization
requirements.
Ship bridge simulator at Venture Canada's Naval Officers Training
Center, Victoria B.C., Canada upgraded from Barco 12-channel CRT
projection system to Barco DLP solution. Photo courtesy of Kongs-
berg Maritime.
AUGUSTMN2005 5(33-40).qxd 8/2/2005 2:06 PM Page 33
Digital Wave Publishing